Update pedestrian crossings and multi-use paths for improved intersection, pedestrian, and cyclist safety along the Langley Bypass.
Current Status
In Construction
Estimated duration
August 2026 to December 2026
Estimated Investment
$5,681,332.73
Funding Partners
TransLink
City project manager
Nitesh Dugg
Contractor
BA Blacktop Infrastructure Inc.
Consultant
RF Binnie and Associates Ltd.
Traffic impacts
At least one lane remains open in all directions at all times.
Langley Bypass (Southbound): Closures allowed 7:00 AM – 3:00 PM.
Langley Bypass (Northbound): Closures allowed 9:00 AM – 5:00 PM.
Night Work: Paving from 7:00 PM – 6:00 AM.
Full project description
Replace the existing sidewalks on both sides of the Bypass with a wider multi-use path for pedestrians, cyclists, and other users.
Increase pedestrian safety by upgrading intersections along the Bypass at 56 Avenue and Fraser Highway, where heavy pedestrian traffic heads to Langley Secondary School and Kwantlen Polytechnic University.
Relocation of curbs to allow for the construction of multi-use pathways.
Replace the existing asphalt along the Bypass between 56 Avenue and Fraser Highway.
Add street lights, landscaping, and trees.
Project images
Langley Bypass area to be enhanced with an improved multi-use path for safer walking, biking, and rolling.
Langley Bypass area to be enhanced with an improved multi-use path for safer walking, biking, and rolling.
Southern area of Langley Bypass multi-use path to be connected to existing improved pedestrian amenities
Langley Bypass Roadway and Cycling Improvement Capital Project Sign